Bathroom Remodeling · Rockland County, NY
Bathroom Remodeling in Rockland County, NY
Explore bathroom remodeling in Rockland County, NY. Rockland Design Factory designs and builds bathroom remodels from its showroom at 437 US-9W N in Congers, NY, serving Rockland County since 1998. Work covers vanities, tile, walk-in showers and full layouts. A full bathroom typically ranges from $21,000–$35,000, with construction typically about 20 days. Start with a free 60-minute showroom design consultation at our Congers showroom, or try the Kitchen Builder on your phone.
Kitchen remodel cost in Rockland County, NYKitchen showroom in Rockland County, NY

What is included
What does a full bathroom remodel include?
One team handles design, cabinetry and construction. Our own in-house staff handle plumbing and electrical work under Rockland Design Factory, with no subcontractors. The county certificate restricts us from using subcontractors. Confirm the proposed layout, materials, required permits and responsibilities in a written scope before work begins.
- Vanity selection, including the LifeArt displays in the showroom
- Walk-in showers, tile layouts and fixture planning
- Primary bathrooms and wet-room layouts
- Demolition through finish by our own crew
- 2-year workmanship warranty, with terms confirmed in writing

Cost
How much does bathroom remodeling cost in Rockland County?
The published typical range is $21,000 to $35,000 for a full bathroom remodel. The written scope establishes your project’s actual price, based on the layout, cabinetry, materials and construction responsibilities. Confirm what is included and excluded before comparing proposals or committing to an order.
| Project | Typical range | What it covers |
|---|---|---|
| Cabinets only | From $6,000 | Cabinetry purchase. No installation included. |
| Full kitchen remodel | $65,000–$110,000 | Design, cabinetry, demolition and full construction. |
| Full bathroom remodel | $21,000–$35,000 | Full gut-and-rebuild of a standard bathroom. |
Ranges from our published FAQ. Every estimate requires a written scope. Typical construction is about 20 days per kitchen or bathroom; ordering and permit lead times are separate and vary.
Confirm these details in your written scope
Use this checklist when reviewing a proposal. These are details to confirm, not a promise that every item is included in a published price range.
- Fixtures and room layout
- List the vanity, countertop, fixtures, tile and shower enclosure, who supplies them and whether installation is included. Identify changes to plumbing or fixture locations.
- Waterproofing and drainage
- Ask for the specified wet-area system and its installation requirements in the written scope. Agree on how preparation, drainage and any applicable tests or inspections will be checked and documented.
- Ventilation, electrical work and approvals
- Identify the responsible parties for ventilation and electrical work, applicable trade credentials, permit applications and inspection coordination. Do not treat a home improvement certificate as proof of separate trade licensing.
- Temporary access and final checks
- Plan access to another bathroom during work. Agree on a final review of fixture operation, drainage, ventilation, finish details and the care and warranty documents to retain.
Which building department issues remodel permits in Rockland County
The posted home improvement certificate states “No subcontractors”; it does not independently establish separate plumbing or electrical trade credentials. Confirm the responsible parties and applicable approvals for your scope before signing.
Bathroom planning
What should you compare before a bathroom renovation?
Start with the room’s wet areas, storage and everyday use. Compare the proposed layout, vanity, shower, tile and finish selections together rather than choosing by appearance alone. Confirm measurements, materials and installation responsibilities in a written scope before ordering, and discuss any permit requirements with the responsible building department.
Shower, tub and waterproofing
Compare the bathing layout, drainage and the specified wet-area system. Tile and grout are not a substitute for a complete waterproofing plan.
Vanity and everyday storage
Check door and drawer clearances, countertop space and plumbing access against the actual room measurements.
Ventilation, lighting and power
Discuss moisture removal, task lighting and electrical requirements with the project team. Requirements depend on the planned work and local approvals.
Comfort and access
Discuss entry clearances, slip resistance and future needs. Heated floors, grab-bar backing and other options need to be specified in the written scope.
What are the steps, start to finish?
Start with room information and a design consultation. Confirm the layout, selections and written scope, then coordinate ordering, required permits, construction and the final walkthrough. Our own in-house crew does the work. Typical construction is about 20 days, separate from planning, ordering and permit time.
- 01
Discuss the bathroom
Bring photographs and describe problems with the shower, tub, storage or access. Identify whether the room is a primary bath, shared bath or powder room.
- 02
Measure and agree on scope
Review fixture locations, clearances, vanity storage and ventilation. Record what is included and excluded in the written project scope.
- 03
Review layout and selections
Coordinate the vanity, fixtures, tile and lighting. Project-specific 3D renderings can help review the proposed layout before ordering.
- 04
Confirm wet-area details
Ask how the specified waterproofing system, shower drainage and tile preparation will be installed and checked. Confirm ventilation and accessibility options where relevant.
- 05
Order and check permit requirements
Confirm material availability and the applicable local approvals before scheduling work. Permit requirements and lead times depend on the actual scope and municipality.
- 06
Coordinate construction
Agree on sequencing for preparation, plumbing, electrical, waterproofing, tile and fixture installation, plus any required inspections. Arrange temporary bathroom access; the schedule is project-specific.
- 07
Review the finished bathroom
Review drainage, fixture operation, ventilation and finish details together. Keep the written closeout, product-care and applicable warranty information.
3D design renderings are available
During the design phase we can prepare 3D renderings of your kitchen or bathroom so you can review cabinet layout and finishes before ordering. Professional renderings are prepared for your project.
Want to sketch your ideas first? Try our free 3D kitchen design tool or 3D bathroom design tool, then bring your design to the showroom.
Credentials
Rockland County home improvement certificate
Rockland County, NY
County certificate details
- Issued to
- Rockland County NY Handy Man Services LLC, DBA Rockland Design Factory
- Doing business as
- Rockland Design Factory
- Named on certificate
- Simon SeseRockland County home improvement certificate CP-H-24014 is issued to Rockland County NY Handy Man Services LLC, DBA Rockland Design Factory (owner Simon "Sean" Sese).
- Effective
- January 9, 2026
- Expires
- January 9, 2027
- Restriction
- NO SUBCONTRACTORS
Rockland County home improvement certificate CP-H-24014 is effective January 9, 2026 through January 9, 2027.
Plumbing and electrical work is performed by Rockland Design Factory's own in-house staff, under Rockland Design Factory, with no subcontractors. All trades are our employees.
2 yr
Workmanship warranty
10 yr
Cabinetry warranty
Workmanship terms are confirmed in writing with each project. Manufacturer cabinetry warranties are governed by the written product terms for the line you choose. See the general liability certificate details. Confirm current coverage and any project-specific bonding requirements in writing before work begins.
Before ordering, confirm in writing who provides the quoted cabinetry coverage, which collection and components it covers, exclusions and the claim process. Do not assume every manufacturer offers the same 10-year term. Cabinet-only purchases do not include installation or an installation workmanship warranty unless installation is separately contracted.
Considering financing? Explore Acorn and Affirm financing. Approval and terms are determined by the provider.
Near you
Bathroom Remodeling by town
Orangetown & the river villages
Ramapo
Other services
Also from the same showroom
Google Customer reviews
What customers wrote, in their words.
4.9 ★ · 29 Google reviews
Historical Google rating: 4.9 out of 5
As of November 13, 2026
★★★★★
“The whole was great, very accommodating and their work is superb. Thank you for renovating my little old house. Can't wait for the next project with them.”
Hazel P.Approximate review date: 2025 ★★★★★
“We recently had Rockland Design remodel both our bedroom and main bathrooms. They quoted a very reasonable price, they were easy to work with and the end result in both is stunning!”
Elaine MahoneyApproximate review date: 2025 ★★★★★
“A huge shout out to Simon, Sean and their crew from Rockland Design Factory for the wonderful job they did in renovating my kitchen. They took the time to listen to what we wanted and made it happen. We will definitely be giving them a call again for our next project.”
J LavApproximate review date: 2025
Selected Google reviews transcribed from screenshots supplied by the owner. These are selected reviews, not all feedback. Approximate review dates were supplied by the owner from Google Business Profile, captured November 13, 2026; exact posting dates were not supplied. The 4.9 rating and 29-review count are a snapshot as of November 13, 2026, not a live feed. Read all current feedback on Google.
Read all reviews on Google (opens in a new tab)FAQ
Questions people ask before visiting
How much does a bathroom remodel cost?
A full bathroom typically ranges from $21,000–$35,000. Final pricing follows a written scope.
How long does a remodel take?
Typical construction is about 20 days for a kitchen and about 20 days for a bathroom. Ordering and permit lead times are separate and vary, so this is a typical figure, not a guarantee.
What Rockland County home improvement certificate is displayed?
Rockland County certificate CP-H-24014 is issued to Rockland County NY Handy Man Services LLC, DBA Rockland Design Factory, effective January 9, 2026 through January 9, 2027, with the restriction "No subcontractors".
What warranties do you provide?
A 2-year workmanship warranty and a 10-year cabinetry warranty. Workmanship terms are confirmed in writing for each project; manufacturer cabinetry warranties follow the written product terms. Before ordering, confirm in writing who provides the quoted cabinetry coverage, which collection and components it covers, exclusions and the claim process. Do not assume every manufacturer offers the same 10-year term. Cabinet-only purchases do not include installation or an installation workmanship warranty unless installation is separately contracted.
Do I need an appointment to visit the showroom?
Walk-ins are welcome during showroom hours: Monday–Friday 8:30 AM–5:00 PM; Saturday 10:00 AM–3:00 PM; Sunday closed.
Do you handle a full bathroom remodel in Rockland County?
Yes. Rockland Design Factory provides bathroom design, 3D planning and remodeling from its Congers showroom. Plumbing and electrical work is performed by Rockland Design Factory's own in-house staff, under Rockland Design Factory, with no subcontractors. All trades are our employees. Your written scope defines the included work. Material lead times and required permits are confirmed separately.
Can I book a Sunday consultation?
No. The Rockland Design Factory showroom in Congers is closed Sunday, with no Sunday appointments. Showroom hours are Monday–Friday 8:30 AM–5:00 PM; Saturday 10:00 AM–3:00 PM; Sunday closed. Walk-ins are welcome during those hours; online consultation booking shows the available appointment times.
What is a realistic budget for a bathroom remodel?
In Rockland County, a full bathroom remodel with Rockland Design Factory typically costs $21,000–$35,000. Your actual price comes from a written scope after we measure the room. Financing: Acorn & Affirm.
What do I wish I knew before my bathroom remodel?
Five things homeowners often learn too late. Moving plumbing or fixtures raises cost. Waterproofing behind the tile matters more than the tile itself. Ordering and permits happen before the roughly 20 days of construction. You need a second bathroom during the work. Every inclusion should be in a written scope.
Can a limited budget cover a full bathroom remodel?
Our published full bathroom remodeling range is $21,000–$35,000. Bring your intended budget and scope to a free 60-minute showroom design consultation at our Congers showroom. We'll explain what the written proposal includes and what it does not.
What is the most expensive part of a bathroom remodel?
Labor and plumbing changes usually drive the cost most, especially moving a toilet, shower or vanity to a new location. The shower is often the costliest area because it needs waterproofing, drainage and tile work. Keeping fixtures where they are is one of the best ways to control your budget.
Before your visit
Helpful bathroom planning guides
Showroom
Rockland Design Factory Kitchens & Baths Showroom
437 US-9W N, Congers
1,800 sq ft · Walk-ins welcome during listed hours.
- Monday – Friday
- 8:30 AM – 5:00 PM
- Saturday
- 10:00 AM – 3:00 PM
- Sunday
- Closed
Find our Congers showroom
The Google map loads only when you choose. You can also use the Get directions link to open Google Maps directly.
Recent Project: Nanuet, NY
Watch the before and after of our completed Nanuet bathroom remodel, including the walk-in shower, wave wall tile, recessed niche, vanity and LED mirror.
Bathroom Remodel – Nanuet, NYOur completed projects
- Kitchen & Bathroom Remodel — Piermont, NY, Piermont, NY
White shaker cabinetry with brass pulls and knobs, an unlacquered brass bridge faucet over a workstation sink, handmade square tile backsplash with under-cabinet lighting, and quartz countertops. Bathroom rebuilt from the studs: new tub, fully waterproofed surround, deep green glazed tile with a built-in niche, brushed brass shower fixtures, and a floating wood vanity with brass faucet and mirror.
- Bathroom: start to finish, New City, NY
Watch a New City, NY bathroom remodel by Rockland Design Factory, from the original room through work in progress to the finished bathroom.
- Bathroom Remodel – Nanuet, NY, Nanuet, NY
Before and after of a completed Nanuet bathroom remodel with a tiled walk-in shower, wave wall tile, recessed niche, new vanity and LED mirror.
- Walk-in shower bathroom, New City, NY
A completed New City bathroom built around a walk-in shower.
Next step
Start with how your bathroom needs to work.
Bring room photos and describe concerns with the shower, storage or access. Review your priorities and proposed scope during your free 60-minute design consultation.
Related guides
How much does a bathroom remodel cost in Rockland County?
A full bathroom remodel typically costs $21,000 to $35,000. Your room, layout, selections and written scope establish the proposed price. Rockland Design Factory handles design and construction with its own in-house team. Planning, ordering and required permits come first and are separate from the typical construction period of about 20 days.
Request a free estimate
Tell us about your kitchen, bathroom or cabinets-only project. This is a request, not an appointment or a binding quote.
Family-owned since 1998. Showroom in Congers, NY.



