A cabinets-only purchase
Review the cabinet list, dimensions, finish, accessories, delivery arrangements and installation responsibility in the showroom. The published starting price excludes installation. Do not assume countertops, demolition, electrical work or plumbing are included unless your written quote says so.
A full kitchen remodel
Start with the room layout and written scope. Identify which construction, materials and finishes are included and which are excluded. High-end kitchen projects have a separate published range of $65,000–$110,000; the final price depends on the agreed project.
Compare equivalent responsibilities
A cabinet package and a full renovation are not interchangeable quotes. Separate product costs from installation and construction, check tax and delivery, and confirm who performs final field measurements before manufacturing or ordering.
What information makes the first meeting useful?
Bring photographs and a sketch with wall lengths, doors, windows and appliance positions. Mark anything you want to keep and anything you want to move. That distinction helps separate a cabinet purchase from work affecting the whole room. Sean reviews the layout on a large projector screen during the free 60-minute design consultation, while full-size doors help you compare styles and finishes.
If another installer is handling your cabinets, identify that responsibility before ordering. The final measurements, delivery access and cabinet list need to agree with the layout. If you want Rockland Design Factory to handle the full remodel, discuss demolition, fixtures, flooring and other included work as part of the room-wide written scope.
How do ordering and construction fit together?
Cabinets typically arrive in two to three weeks, with exact timing confirmed for the selected line when ordering. Whole-room construction is a separate stage; design decisions, materials and required approvals must be coordinated first. A cabinet lead time should not be treated as the time needed to finish a complete kitchen renovation. Use the timeline and permit guides alongside your measured proposal.
Plan your next step
Published cost ranges · Compare cabinet quotes · Kitchen measuring worksheet · All planning resources

