ROCKLAND DESIGN FACTORY KITCHENS & BATHS SHOWROOM
ROCKLAND DESIGN FACTORYKITCHENS & BATHS SHOWROOM
Home

Cost guide · Rockland County

Kitchen & bath remodel costs in Rockland County, NY

In Rockland County, Rockland Design Factory's typical ranges are: cabinets only from $6,000 without installation; a full kitchen remodel $65,000 to $110,000; a high-end kitchen $120,000 to $220,000; a full bathroom $21,000 to $35,000; and a primary or wet-room bathroom $28,000 to $55,000. Every estimate requires a written scope.

Completed shaker kitchen remodel in New City, NY with light wood cabinets
Completed project New City, NY

Kitchen budget, cabinet and remodeling questions

Ranges

Typical project costs in Rockland County

These are the typical ranges we publish. Your exact price comes from a written scope after a free measure.

Typical project ranges in Rockland County
ProjectTypical rangeWhat it covers
Cabinets onlyFrom $6,000Cabinetry purchase. No installation included.
Full kitchen remodel$65,000 – $110,000Design, cabinetry, demolition and full construction.
High-end kitchen remodel$120,000 – $220,000Larger footprints, premium cabinetry and finishes.
Full bathroom remodel$21,000 – $35,000Full gut-and-rebuild of a standard bathroom.
Primary / wet-room bathroom$28,000 – $55,000Primary suites and open wet-room layouts.

Ranges from our published FAQ. Every estimate requires a written scope. Typical construction is about 20 days per kitchen or bathroom; ordering and permit lead times are separate and vary.

For published budget guidance, Ask Sean, our AI assistant. He explains the ranges above, not personalized estimates. For your own written scope, book a free 60-minute 3D consultation.

How long does it take?

Typical construction is about 20 days for a kitchen and about 20 days for a bathroom. Planning, ordering and permit lead times come first, vary, and are separate. These are typical figures, not guarantees.

What moves the number?

Room size, cabinet tier, layout changes that move plumbing or walls, and finish selections. A written scope pins these down before any price is final.

Cabinet tiers

Where cabinet choice shifts cost

Stock vs semi-custom vs custom cabinets
 StockSemi-customCustom
SizingFixed sizes, filled with fillersStandard sizes with modificationsBuilt to the room
Door styles and finishesLimited selectionWide selectionWidest selection, specialty finishes
Lead timeShortestModerateLongest
Relative costLowestMiddleHighest
Good fit forRentals, budget refreshesMost family kitchensUnusual rooms, high-end kitchens

General industry categories. Which tier a given line falls into, and its current lead time, is confirmed for your order in the showroom.

Process

From estimate to finished room

  1. 01

    Visit or call

    Walk into the Congers showroom during open hours or call (845) 682-3076. Bring photos and rough measurements if you have them.

  2. 02

    Measure and scope

    We measure the room and agree on what is in and out of the job. Every estimate is based on a written scope.

  3. 03

    Design with 3D renderings

    Your layout is drawn up and 3D design renderings are available so you can review the plan before ordering.

  4. 04

    Select cabinetry and finishes

    Compare door styles, finishes and boxes from the showroom lines. Tile and flooring can be sourced from suppliers such as Floor & Decor.

  5. 05

    Order and permits

    Materials are ordered and permits are pursued where required. Lead times vary by line and by municipality and are separate from construction time.

  6. 06

    Construction

    Typical kitchen or bathroom construction takes about 20 days each, after separate planning, ordering and permit time. This is a typical figure, not a guarantee.

  7. 07

    Walkthrough and warranty

    We walk the finished room with you. 2-year workmanship and 10-year cabinetry warranty terms are confirmed in writing.

FAQ

Questions people ask before visiting

Can I buy kitchen cabinets without a full remodel?

Yes. Homeowners and trades can buy cabinets only. Cabinets-only orders start from $6,000 and do not include installation.

How much does a kitchen remodel cost in Rockland County?

A full kitchen remodel typically ranges from $65,000 to $110,000, and a high-end kitchen from $120,000 to $220,000. Every estimate requires a written scope.

How much does a bathroom remodel cost?

A full bathroom typically ranges from $21,000 to $35,000, and a primary or wet-room bathroom from $28,000 to $55,000. Final pricing follows a written scope.

How long does a remodel take?

Typical construction is about 20 days for a kitchen and about 20 days for a bathroom. Ordering and permit lead times are separate and vary, so this is a typical figure, not a guarantee.

Next step

Bring your measurements. We will bring the door samples.

Bring room photos, rough dimensions and appliance information to your free 60-minute design consultation. Choose an available time online.

Ask Sean AI assistant

Rockland Design Factory Kitchens & Baths Showroom

437 US-9W, Congers, NY 10920

Rockland County certificate CP-H-24014